login
quiescence.eu

Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids

Forthcoming

Status as published by the data source.

Sign in to bookmark this

Expected Outcome:
Project results are expected to contribute to all the following expected outcomes:

• Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively;
• Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs;
• Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services. Scope:
Projects are expected to address all the following items:

• Design and test innovative solutions, architectures, technologies and processes for advancing the way the ADSM are designed and operated;
• Provide ADSM software platforms that improve grid performance, controllability, and help integrating distributed energy resources (DERs) in an efficient way, while reducing congestion and improving grid flexibility;
• Advance forecasting solutions for energy supply, demand, and flexibility made available to the system operator; provide advanced analytics and visualisations;
• Advance interoperability, both with TSOs and other DSOs, as well as with the DERs at the edge of the grid;
• Leverage modern solutions, notably digital twins and artificial intelligence. Use security-by-design and advanced protection mechanisms against cyber threats. Use and/or develop, to the greatest extent possible, open-source software solutions and or software modules;
• Develop a manual and propose best practices on this matter to be used by other DSOs (including instructions to operate the system). Identify remaining gaps and further needs for research and development. The demonstration, test and validation of the activities should be carried out in at least two pilots in different EU Member States or Associated Countries.
Projects are expected to include at least three Distribution System Operators (DSOs) and at least two universities and/or research organisations.
Additionally, collaboration is encouraged with the following entities:

• at least one supplier of technology and solutions for ADMS;
• at least one transmission system operator, which manage grids that are connected to the grids operated by any of the DSOs that are partners in the project;
• (at least) one project funded under the separate call ‘Advanced TSO control rooms to enhance grid control and resilience’ with the view to strengthen TSO-DSO coordination and support interoperable solutions. To that end, the project proposals are expected to describe a credible mechanism to do so. This collaboration (minimum number of entities) is sought per project in total and does not necessarily apply per each pilot in particular.
Selected projects are expected to contribute to the BRIDGE initiative[1] and actively participate in its activities.
null
Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] https://bridge-smart-grid-storage-systems-digital-projects.ec.europa.eu/

Status
Forthcoming
Deadline
(time not stated)
Opens
Published
Total budget
€28,500,000
Grant range
€9,500,000 – €9,500,000
Country
European Union (EU-wide)
Programme
Horizon Europe (HORIZON)
Official page
Open at the source portal

Other calls under Horizon Europe (HORIZON)

All calls under this programme

Similar opportunities

Where this came from

Source document
https://ec.europa.eu/info/funding-tenders/opportunities/data/topicDetails/horizon-cl5-2027-07-d3-26.json
Document fingerprint
d7bcb9da4466793f (SHA-256, first 16 hex characters)
Retrieved
First recorded here

What has changed

Data source

© European Union, 2026. Source: EU Funding & Tenders Portal. Reused under Commission Decision 2011/833/EU — CC BY 4.0.

Retrieved from the source on .

The source last updated this document on Mon, 02 Mar 2026 09:42:17 GMT.

Personal data of natural persons has been dissociated by quiescence.eu.

This service is not affiliated with, sponsored or endorsed by the data publishers.