Industrial Readiness for Affordable Ka-band User Terminals
Open
Status as published by the data source.
Expected Impact:
Projects funded under this call are expected to deliver tangible industrial outputs that demonstrably advance the readiness and affordability of future governmental Ka-band user terminals for IRIS2 and GOVSATCOM services. Expected outputs include, for example: qualified production processes, calibrated sub-assemblies, pilot-run units, validated manufacturing equipment chains or manufacturing cost models.
Purely analytical deliverables (studies, design reports) are not sufficient as primary outputs but may complement the above.
Where relevant, outputs shall include documented design assumptions, interface parameters or process specifications enabling adaptation to different terminal configurations with limited re-engineering, so as to support uptake in follow-on integration, pilot deployment and scale-up activities.
Objective:
The aim of this call for proposals is to advance the industrial readiness of European Ka-band user terminal technologies, subsystems and manufacturing processes, with a view to enabling cost-effective production of user terminals for services provided under the Union secure connectivity programme (IRIS²) and GOVSATCOM.
The target reference for this call is the Ka-band user terminal segment of IRIS², operating with non-geostationary satellite constellations in low Earth orbit (LEO) and medium Earth orbit (MEO). Proposed activities shall be relevant across the full Ka-band frequency range, covering both commercial Ka-band (17.7-20.2 GHz downlink, 27.5-30.0 GHz uplink) and military Ka-band (20.2-21.2 GHz downlink, 30.0-31.0 GHz uplink). Proposals should leverage commonality between governmental and commercial terminal variants to maximise production volumes and cost reduction.
Scope:
Submitted proposals shall address a coherent approach to improving the affordability, manufacturability and production readiness of future Ka-band user terminals, with a focus on technologies and subsystems that are sufficiently mature to support near-term industrialisation (at least TRL5 or above at the start of the action) and consistent with production scenarios on the order of 1000 units per month at scale, on a multi-year horizon. All proposed activities must demonstrate a clear and credible link to the cost, manufacturability or deployment readiness of a complete Ka-band user terminal aligned with 5G NR NTN terminal development paths, including where relevant phased array or other advanced antenna subsystem technologies.
These actions shall address one or more of the following:
• Antenna-subsystem industrial readiness, including assembly, calibration and test processes, as the antenna subsystem represents the dominant cost driver in Ka-band terminal production
• Manufacturing processes and equipment enabling improved throughput, repeatability and unit-cost reduction
• Supply-chain measures reducing critical dependencies on non-European sources and strengthening European industrial capability for terminal components
• Modem and baseband industrial readiness for 5G NR NTN compliant solutions, including industrialisation of baseband processing subsystems and migration paths towards volume-production architectures
- Status
- Open
- Deadline
- (time not stated)
- Opens
- Published
- Total budget
- €20,000,000
- Grant range
- €7,000,000 – €20,000,000
- Country
- European Union (EU-wide)
- Programme
- Pilot Projects and Preparation Actions (PPPA)
- Official page
- Open at the source portal
Other calls under Pilot Projects and Preparation Actions (PPPA)
- Integrated Surveillance mechanism: Regional Cable hubs
- Youth-Driven Social Media Design: Safe, Inclusive, and Publicly-Owned Social Media
- Smart Social Economy Model in Tourism (Long Distance Trails)
All calls under this programme
Similar opportunities
- Platforms and end-products
- Standards for Quantum Technologies
- Pilot access schemes to Technology Infrastructures for European startups, scaleups and innovative SMEs (CSA)
- Key electronic components
- Fast Track to Research and Innovation for breakthroughs in industrial technologies (Research and Innovation Action)
- Interregional Innovation Investments Strand 2a
Where this came from
- Source document
- https://ec.europa.eu/info/funding-tenders/opportunities/data/topicDetails/pppa-2026-iris2-ut-ind-readiness.json
- Document fingerprint
e51e0e1ae3b3c762(SHA-256, first 16 hex characters)- Retrieved
- First recorded here
What has changed
- url first recorded as https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/opportunities/topic-details/pppa-2026-iris2-ut-ind-readiness on
- currency first recorded as EUR on
- amount_max first recorded as 20000000.00 on
- amount_min first recorded as 7000000.00 on
- budget_total first recorded as 20000000.00 on
- deadline first recorded as 2026-08-26 on
- opens_on first recorded as 2026-05-27 on
- published_on first recorded as 2026-05-27 on
- status_basis first recorded as source_status on
- status first recorded as open on
- title first recorded as Industrial Readiness for Affordable Ka-band User Terminals on
Data source
© European Union, 2026. Source: EU Funding & Tenders Portal. Reused under Commission Decision 2011/833/EU — CC BY 4.0.
Retrieved from the source on .
The source last updated this document on Mon, 01 Jun 2026 15:38:54 GMT.
Personal data of natural persons has been dissociated by quiescence.eu.
This service is not affiliated with, sponsored or endorsed by the data publishers.