1040 BRUSSEL : RESIDENCE PALACE - Stabiliteitsstudie van het steegje, bepaling van de toelaatbare belasting en van de verstevigingen voor de doorgang van de brandweer
Open
The source does not publish a status. We worked this out from the opening and closing dates it does publish.
1040 BRUSSEL : RESIDENCE PALACE - Stabiliteitsstudie van het steegje, bepaling van de toelaatbare belasting en van de verstevigingen voor de doorgang van de brandweer
- Status
- Open
- Procedure
- NEG_WO_CALL_24
- Deadline
- Published
- Country
- Belgium
- Funder
- Regie der Gebouwen - Regio Brussel
- Official page
- Open at the source portal
What applying involves
2 steps, all of them taken from this call's own documents.
Understand the call
- Read the call on the source portal and download its documents
Submit
- Submit before the closing date shown above
Similar opportunities
- 1000 BRUSSEL : KONINKLIJK BELGISCH INSTITUUT VOOR NATUURWETENSCHAPPEN “Geologie” Stabiliteitswerken stookplaats
- Accompagnement dans l'analyse du risque incendie dans le cadre de la révision décennale
- Studieopdracht voor architectuur, stabiliteit, technieken, EPB verslaggeving/EPC, veiligheidscoördinatie en opmaak sloopopvolgingsplan nieuwbouw en beperkte renovatie Diaobolo school Kraainem
- 24/026 - Front-end Engineering Design (FEED), Client Partner, and Engineering Peer Review and Specialist Technical Advisor for Strategic Gas Emergency Reserve Qualification System Questionnaire
- Wykonanie 19 analiz technicznych, ocen, opinii i ekspertyz oraz opracowania dokumentacji dot. możliwości wykorzystania wskazanych budynków na potrzeby utworzenia miejsc doraźnego schronienia
- 1000 BRUSSEL: BELGISCH CENTRUM BEELDVERHAAL - TECHNISCHE STUDIE EN INSPECTIE VAN DE VOORGEVEL
Where this came from
- Source document
- https://www.publicprocurement.be/api/sea/search/publications?publicationDate=2026-09-23&page=1&pageSize=200
- Document fingerprint
9e79c25c0a944db2(SHA-256, first 16 hex characters)- Collected
- First recorded here
What has changed
- deadline changed from 2026-09-25 to 2026-10-14 on
- published_on changed from 2026-08-25 to 2026-09-23 on
- url first recorded as https://www.publicprocurement.be/publication-workspaces/5d4a82e5-6581-4efa-81f8-278f06f2c305/general on
- deadline first recorded as 2026-09-25 on
- published_on first recorded as 2026-08-25 on
- procedure_type first recorded as NEG_WO_CALL_24 on
- status_basis first recorded as derived_window on
- status first recorded as open on
- title first recorded as 1040 BRUSSEL : RESIDENCE PALACE - Stabiliteitsstudie van het steegje, bepaling van de toelaatbare belasting en van de verstevigingen voor de doorgang van de brandweer on
Data source
Source: Bulletin des Adjudications / Bulletin der Aanbestedingen — BOSA e-Procurement.
We collected this from the source on .
Personal data of natural persons has been dissociated by quiescence.eu.
This service is not affiliated with, sponsored or endorsed by the data publishers.