Resource assessment for deep sedimentary and basement reservoirs
Open
Status as published by the data source.
Expected Outcome:
Deep sedimentary/basement reservoirs are usually characterized by low permeability, high drilling cost and a scarcity of data, as they are typically ignored by hydrocarbon exploration. Major exploration challenges relate to predicting deep sedimentary and basement reservoir structures and properties to identify suitable locations for reservoir-independent approaches, capable of overcoming the low permeability obstacle, such as Enhanced Geothermal Systems (EGS) or closed-loop geothermal systems.
Project results are expected to contribute to all of the following expected outcomes:
• Increased knowledge base for developers to unlock unexploited geothermal resources, increase drilling success rate, increase geothermal sources performance and reduce the risk of induced seismicity and deploy geothermal energy in a sustainable way in environmental (notably on biodiversity and pollution) and socioeconomic terms.
• Citizens and local communities are engaged and benefit from local, more secure and affordable renewable energy sources. Scope:
Advanced methods, technologies and conceptual models, for different geological settings, to identify suitable conditions for geothermal resource exploitation, tackling the issue of data scarcity and leveraging the information available. The proposals are expected to contribute to the assessment of environmental and social impacts and to unlock geothermal resources marked by low natural permeability at depths between 2000-6000m.
The scope covers advances beyond the state of the art in equipment, methods and models capable of providing in-depth understanding and predictive power for properties and processes beyond conventional depths. The proposals are expected to take into account the impact of reservoir conditions and parameters (i.e. in-situ stress, temperature, geo-mechanical, chemical properties) on the development and performance of the geothermal resources, covering, when relevant, aspects such as the suitability for different stimulation techniques, well designs and completion technologies, the possibilities for the coproduction of raw materials, wellbore stability.
The proposals are expected to validate the benefit of the proposed solution in the context of state-of-the-art decision and risk analysis methods.
To ensure trust building and communities’ support, partners are expected to practice inclusive societal engagement, which is early, continuous, and sensitive to the technical specificities (e.g. impact on biodiversity, water balance, pollution, land occupation, visual impact, noise as well as geo-mechanical changes (e.g. seismicity) and underground changes (e.g. disturbance of non-targeted aquifers)) that could affect local communities and ecosystems [1].
This topic requires the effective contribution of SSH disciplines and the involvement of SSH experts, institutions as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities.
Technology Readiness Level - Technology readiness level expected from completed projects
Activities are expected to achieve TRL 4-5 by the end of the project – see General Annex B. Activities may start at any TRL.
[1] For an example of a methodology for the assessment of sustainability, circularity and contribution to the EU resilience and technological autonomy of clean energy technology in the R&I pipeline, please see Study on circular approaches for a sustainable and affordable clean energy transition
- Status
- Open
- Deadline
- (time not stated)
- Opens
- Published
- Total budget
- €18,000,000
- Grant range
- €4,500,000 – €4,500,000
- Country
- European Union (EU-wide)
- Programme
- Horizon Europe (HORIZON)
- Official page
- Open at the source portal
Other calls under Horizon Europe (HORIZON)
- PV based electrification of the economy: Designing & optimising PV systems supporting industrial electrification and promoting participation in electricity markets (EUPI-PV Partnership)
- Advanced TSO control rooms to enhance grid observability, stability and resilience
- Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids
- Community of practice - Data-Driven Decision-Making in Energy
- Industrial processes and equipment for innovative, reliable and scalable tandem technologies (EUPI-PV Partnership)
- Integrated Approaches for Retrofitting Infrastructures with Innovative Energy Storage Technologies
- Demonstration of hydropower technologies for efficient and forward-looking refurbishment of existing hydropower plants
- Delivery of industrial CCUS clusters – Societal Readiness pilot
All calls under this programme
Similar opportunities
- Low disturbance prefabrication approaches for deep renovation of multi-storey buildings (Built4People Partnership)
- Integrated Approaches for Retrofitting Infrastructures with Innovative Energy Storage Technologies
- Pushing the frontier of knowledge and conservation action for deep sea ecosystems
- Developing methods to assess the presence, functions and sensitivity of groundwater ecosystems
- Designing new ways of risk awareness and enhanced disaster preparedness
- Advanced exploration technologies for geothermal resources in a wide range of geological settings
Where this came from
- Source document
- https://ec.europa.eu/info/funding-tenders/opportunities/data/topicDetails/horizon-cl5-2026-11-d3-06.json
- Document fingerprint
f8ff101debe57900(SHA-256, first 16 hex characters)- Retrieved
- First recorded here
What has changed
- url first recorded as https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/opportunities/topic-details/horizon-cl5-2026-11-d3-06 on
- currency first recorded as EUR on
- amount_max first recorded as 4500000.00 on
- amount_min first recorded as 4500000.00 on
- budget_total first recorded as 18000000.00 on
- deadline first recorded as 2026-12-01 on
- opens_on first recorded as 2026-08-04 on
- published_on first recorded as 2025-12-12 on
- status_basis first recorded as source_status on
- status first recorded as open on
- title first recorded as Resource assessment for deep sedimentary and basement reservoirs on
Data source
© European Union, 2026. Source: EU Funding & Tenders Portal. Reused under Commission Decision 2011/833/EU — CC BY 4.0.
Retrieved from the source on .
The source last updated this document on Mon, 03 Aug 2026 22:01:29 GMT.
Personal data of natural persons has been dissociated by quiescence.eu.
This service is not affiliated with, sponsored or endorsed by the data publishers.