RegioSpeicher Mosbach - EPC - Engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption

Open

Not published as a status — worked out here from the application dates.

Sign in to bookmark this

Preliminary Scope of Work: The project comprises the implementation of a turnkey 10 MW / 20 MWh AC-coupled Battery Energy Storage System (BESS) connected to the public grid via an existing 20 kV grid connection point at an adjacent MV/HV substation in 74821 Mosbach, Germany. At the grid connection point, the storage is supposed to deliver a power of 7.5 to a maximum of 10 MW and have a capacity of 2 to a maximum of 3 hours. The BESS should preferably be based on lithium-ion or sodium-ion battery technology and designed for commercial operation in the German electricity market. The possible lithium-ion technologies will be specified in more detail during the tender. The system is expected to support, among others, participation in Frequency Containment Reserve, Automatic Frequency Restoration Reserve, Day-Ahead and Intraday markets. The project site has already been secured and is currently used as agricultural land. The existing substation is located on the adjacent property, with an e

Status
Open
Deadline
Published
Country
Germany
Official page
Open at the source portal

Where this came from

Source document
https://oeffentlichevergabe.de/api/notice-exports?pubMonth=2026-07
Document fingerprint
1e212f621354509b (SHA-256, first 16 hex characters)
Retrieved
First recorded here

What has changed

Data source

Source: Datenservice Öffentlicher Einkauf (Bundesministerium für Wirtschaft und Klimaschutz). CC0 1.0 (CC-ZERO) — no conditions.

Retrieved from the source on .

Personal data of natural persons has been dissociated by quiescence.eu.

This service is not affiliated with, sponsored or endorsed by the data publishers.