RegioSpeicher Mosbach - EPC - Engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption
Closed
The source does not publish a status. We worked this out from the opening and closing dates it does publish.
Preliminary Scope of Work: The project comprises the implementation of a turnkey 10 MW / 20 MWh AC-coupled Battery Energy Storage System (BESS) connected to the public grid via an existing 20 kV grid connection point at an adjacent MV/HV substation in 74821 Mosbach, Germany. At the grid connection point, the storage is supposed to deliver a power of 7.5 to a maximum of 10 MW and have a capacity of 2 to a maximum of 3 hours. The BESS should preferably be based on lithium-ion or sodium-ion battery technology and designed for commercial operation in the German electricity market. The possible lithium-ion technologies will be specified in more detail during the tender. The system is expected to support, among others, participation in Frequency Containment Reserve, Automatic Frequency Restoration Reserve, Day-Ahead and Intraday markets. The project site has already been secured and is currently used as agricultural land. The existing substation is located on the adjacent property, with an e
- Status
- Closed
- Deadline
- Published
- Country
- Germany
- Funder
- Trianel Flexibilitätsprojekte GmbH & Co. KG
- Official page
- Open at the source portal
What applying involved
2 steps, all of them taken from this call's own documents.
This call is closed. The steps below show what applying involved, and are kept for reference only.
Understand the call
- Read the call on the source portal and download its documents
Submit
- Submit before the closing date shown above
Similar opportunities
- Lieferung, Montage und Inbetriebnahme eines Batteriespeichers (BESS)
- Framework Agreement Battery Energy Storage Systems - Energielandschap Lageland
- Speicher S04_Donauried
- Lieferung, Montage und Inbetriebnahme eines Batteriespeichers (BESS II Harrislee)
- Ww. Curslack; Bau Batteriespeicher - Battery Energy Storage System, BESS (IW-22/01-200-002)
- Batteriespeichersystem (BESS)
Where this came from
- Source document
- https://oeffentlichevergabe.de/api/notice-exports?pubMonth=2026-08
- Document fingerprint
20bc2ae980c2531f(SHA-256, first 16 hex characters)- Collected
- First recorded here
What has changed
- published_on changed from 2026-07-23 to 2026-08-10 on
- published_on changed from 2026-08-10 to 2026-07-23 on
- published_on changed from 2026-07-23 to 2026-08-10 on
- published_on changed from 2026-08-10 to 2026-07-23 on
- published_on changed from 2026-07-23 to 2026-08-10 on
- published_on changed from 2026-08-10 to 2026-07-23 on
- published_on changed from 2026-07-23 to 2026-08-10 on
- published_on changed from 2026-08-10 to 2026-07-23 on
- published_on changed from 2026-07-23 to 2026-08-10 on
- published_on changed from 2026-08-10 to 2026-07-23 on
- published_on changed from 2026-07-23 to 2026-08-10 on
- published_on changed from 2026-08-10 to 2026-07-23 on
Data source
Source: Datenservice Öffentlicher Einkauf (Bundesministerium für Wirtschaft und Klimaschutz). CC0 1.0 (CC-ZERO) — no conditions.
We collected this from the source on .