Development of innovative power take-off and control systems for wave energy devices

Closed

Status as published by the data source.

Sign in to bookmark this

Expected Outcome:
Project results are expected to contribute to all of the following expected outcomes:

• Demonstrated increased performance and reliability of wave energy devices.
• Improved knowledge on how to operate wave energy devices, their availability, maintainability and survivability.
• Reduction of LCOE.
• Reinforced industrial supply chain in Europe. Scope:
Power take-off (PTO) and control systems (including "prime mover" (waves to mechanical power) as well as the ancillary equipment like gearboxes, generators, and power electronics, power controllers, grid interfaces and other items) are key subsystems of wave energy converters. PTO and control systems can be improved to increase the efficiency of the whole converter, to increase reliability by controlling for instance the structuring health and power electronics, and to avoid extreme events that might compromise device survivability. Control systems dynamically adapt to and mitigate the forces of the continually changing ocean conditions. This can prevent damage during extreme events, contribute to increased performance and the viability of the technology. The manufacturing and testing of prototypes are relatively costly, and it is imperative that data from the demonstration are available to avoid repeating early engineering mistakes. Validation of the innovative concepts is expected to be done in realistic environments at small scale for longer periods or by onshore testing and controlled lab testing. If validation is done onshore the project should demonstrate that they can make use of existing test rigs or develop a test rig for the project, which can be used after the project by other developers. Development and demonstration of the PTO technology should be combined with control strategies as their requirements are inherently coupled. In the validation it is expected that key performance indicators are used based on international recognized metrics
In the development of the PTO system the ‘circularity by design’ principle should be used.
null
Activities are expected to achieve TRL 5 by the end of the project – see General Annex B.

Status
Closed
Deadline
(time not stated)
Opens
Published
Total budget
€8,000,000
Grant range
€4,000,000 – €4,000,000
Country
European Union (EU-wide)
Programme
Horizon Europe (HORIZON)
Official page
Open at the source portal

Other calls under Horizon Europe (HORIZON)

All calls under this programme

Similar opportunities

Where this came from

Source document
https://ec.europa.eu/info/funding-tenders/opportunities/data/topicDetails/horizon-cl5-2023-d3-02-10.json
Document fingerprint
7a3026d9bb2e2d28 (SHA-256, first 16 hex characters)
Retrieved
First recorded here

What has changed

Data source

© European Union, 2026. Source: EU Funding & Tenders Portal. Reused under Commission Decision 2011/833/EU — CC BY 4.0.

Retrieved from the source on .

The source last updated this document on Tue, 17 Feb 2026 17:09:35 GMT.

Personal data of natural persons has been dissociated by quiescence.eu.

This service is not affiliated with, sponsored or endorsed by the data publishers.