login
quiescence.eu

Integrating circularity in LCA-based modelling frameworks for renovation of buildings (Built4People Partnership)

Forthcoming

Status as published by the data source.

Sign in to bookmark this

Expected Outcome:
Project results are expected to contribute to all of the following expected outcomes:

• Demonstration of measurable reductions in material flows, life cycle energy use and GHG emissions in building renovations that integrate circularity strategies to contribute to achieving net-zero whole life carbon buildings;
• More robust approach to current modelling frameworks to comprehensively reflect the complexity of circularity strategies in life cycle assessments at building scale. Scope:
European buildings are increasingly adopting circularity strategies in renovations to reduce life cycle environmental impacts and improve resource efficiency in response to the requirements based on current frameworks, such as Level(s) and WLC models used by Member States based and EN 15978 standard. The complexity of these circularity strategies, such as material reuse and recycling, and addressing the changing nature of assessed systems with long life cycles are critical for achieving more reliable assessment results. Further work is needed to advance and achieve more detailed modelling frameworks that integrate circularity assessment with life cycle assessment, supporting the delivery of net-zero whole-life carbon buildings.
Proposals should address all of the following:

• Develop a comprehensive modelling framework that integrates circularity assessment in life cycle, covering cradle to cradle system boundary;
• Apply the developed modelling framework to at least three real-life buildings in different climatic regions in different Member States or Associated Countries, for which renovation project developers have adopted ambitious circularity strategies to achieve zero whole-life carbon buildings. Circularity strategies should include reuse and/or recycle, as well as at least one of the following: reduce, repair, refurbish, remanufacture, and repurpose;
• Assess the embodied emissions (from materials, products, and construction processes) and operational emissions (from energy use for HVAC, DHW, electrical appliances, lighting) of the real-life buildings subjected to renovations during their entire life cycle, referencing life cycle stages in EN 15978. This topic implements the co-programmed European Partnership on ‘People-centric sustainable built environment’ (Built4People). As such, projects resulting from this topic will be expected to contribute to the objectives of Built4People, transfer knowledge to its network of innovation clusters[1] and report on results in support of the monitoring of the Built4People KPIs.
null
Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] https://built4people.eu/b4pic_network/

Status
Forthcoming
Deadline
(time not stated)
Opens
Published
Total budget
€27,000,000
Grant range
€6,750,000 – €6,750,000
Country
European Union (EU-wide)
Programme
Horizon Europe (HORIZON)
Official page
Open at the source portal

Other calls under Horizon Europe (HORIZON)

All calls under this programme

Similar opportunities

Where this came from

Source document
https://ec.europa.eu/info/funding-tenders/opportunities/data/topicDetails/horizon-cl5-2027-05-d4-07.json
Document fingerprint
d531663e476a59f5 (SHA-256, first 16 hex characters)
Retrieved
First recorded here

What has changed

Data source

© European Union, 2026. Source: EU Funding & Tenders Portal. Reused under Commission Decision 2011/833/EU — CC BY 4.0.

Retrieved from the source on .

The source last updated this document on Mon, 02 Mar 2026 09:41:55 GMT.

Personal data of natural persons has been dissociated by quiescence.eu.

This service is not affiliated with, sponsored or endorsed by the data publishers.