ENERGY MANAGEMENT SYSTEM FOR BPOST SA/NV
Closed
The source does not publish a status. We worked this out from the opening and closing dates it does publish.
Bpost wishes to implement a future-oriented solution for monitoring, managing and intelligently controlling the energy Bpost wishes to implement a future-oriented solution for monitoring, managing and intelligently controlling the energy flows within some of its buildings, operational sites and logistics infrastructure in Belgium (approximately 100 locations). The contract aims to implement a scalable, secure and future-proof solution that supports Bpost in optimizing its energy consumption, reducing energy costs and realizing its sustainability and electrification strategy. (See: https://bnode.com/sustainability ) This assignment is part of the further roll-out of the energy transition within Bpost, in which the number of electric vehicles, charging infrastructures, battery storage systems and renewable energy sources will increase significantly in the coming years. The selected solution must be able to monitor, manage and, where applicable, intelligently control the various energy
- Status
- Closed
- Procedure
- NEG_W_CALL_25
- Deadline
- Published
- Country
- Belgium
- Funder
- BPOST
- Official page
- Open at the source portal
What applying involved
2 steps, all of them taken from this call's own documents.
This call is closed. The steps below show what applying involved, and are kept for reference only.
Understand the call
- Read the call on the source portal and download its documents
Submit
- Submit before the closing date shown above
Similar opportunities
- Energie- Management Systeem
- Demonstration of hydropower technologies for efficient and forward-looking refurbishment of existing hydropower plants
- Energy Management System
- Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids
- Etude de rentabilité et faisabilité sur le choix technologique le plus approprié de stockage d’énergie
- Energy Management Systems for flexibility services
Where this came from
- Source document
- https://www.publicprocurement.be/api/sea/search/publications?publicationDate=2026-09-16&page=1&pageSize=200
- Document fingerprint
89f1f4ee0de59c9b(SHA-256, first 16 hex characters)- Collected
- First recorded here
What has changed
- url first recorded as https://www.publicprocurement.be/publication-workspaces/00b652cd-9440-4fef-aaf4-65ff924f7ad4/general on
- deadline first recorded as 2026-10-19 on
- published_on first recorded as 2026-09-16 on
- procedure_type first recorded as NEG_W_CALL_25 on
- status_basis first recorded as derived_window on
- status first recorded as open on
- title first recorded as ENERGY MANAGEMENT SYSTEM FOR BPOST SA/NV on
Data source
Source: Bulletin des Adjudications / Bulletin der Aanbestedingen — BOSA e-Procurement.
We collected this from the source on .
Personal data of natural persons has been dissociated by quiescence.eu.
This service is not affiliated with, sponsored or endorsed by the data publishers.